Clause B1
Structure
Buildings, building elements and sitework must withstand the loads and physical conditions that can reasonably be expected during construction and use.
Project manager focus
Keep the consented structural design, producer-statement requirements, engineer observations and construction records aligned. Do not approve an unreviewed structural substitution or site change.
Stages
- Site investigation
- Earthworks
- Foundations
- Framing
- Structural steel
- Construction monitoring
Compliance pathway to confirm
- Project-specific Acceptable Solution or Verification Method cited in the consent
- Specific engineering design where the design is outside a cited prescriptive pathway
Controlled documents
- Consented structural drawings
- Structural calculations
- Specifications
- Geotechnical report
- Approved amendments and minor variations
Evidence and records
- Engineer site observations
- Concrete and reinforcing records
- Fixing and bracing evidence
- Producer statements where required
- Inspection outcomes
Inspection questions
- Is the current approved structural detail on site?
- Are hold points released before work is concealed?
- Do penetrations, substitutions or set-out changes have written design acceptance?
Stop and escalate
- Cut, drilled or relocated structural members
- Unapproved product substitution
- Work concealed before observation
- Founding conditions differ from the design assumptions
Official source reviewed 11 August 2026. Recheck before relying on it for a live project.