Safety · Free editable form
Hazard register
List site hazards, risk controls, owners, review dates, and close-out evidence.
When to use
From site setup until handover; update whenever conditions change.
Completed by
Construction manager/site supervisor
Review / sign-off
Site supervisor/H&S lead
Private by design
A saved draft stays in this browser’s local storage. BuildPath NZ does not receive the entries. Clear shared devices after use and place exported records in the project’s controlled document system.
BuildPath NZ · Educational project record
Hazard register
Version 1 · Printed 15/08/2026
Prepared by / signature
Reviewed by / signature
Date
BuildPath NZ is an educational guide and project-management resource only. It does not replace advice from Auckland Council, a planner, architect, engineer, surveyor, quantity surveyor, lawyer, accountant, lender, insurer, insurance broker, WorkSafe, Watercare, utility provider, building consent authority or other qualified professional.
Evidence to attach
- Photos
- Toolbox talks
- Corrective actions
Common mistakes
- Writing vague notes such as 'all good' without location, drawing reference, trade, or evidence.
- Leaving signature, date, revision, or responsible-person fields blank.
- Filing the form in only one person's phone instead of the project record.
- Using the form to approve a technical change without an RFI, designer/engineer instruction, minor variation, amendment, or contract approval where required.
Storage and document control
Store in the project document system under the matching folder: safety, quality, contract, council/CCC, handover, or site administration. Keep photos with the same date and location reference.
Source / Where to check
Check the current consented drawings and specifications, project contract, Auckland Council records and inspection requirements, MBIE Building Performance guidance, WorkSafe NZ guidance, relevant NZ Standard, consultant instructions, producer statements, product technical information, warranties, and manufacturer installation instructions.
Insufficient data to verify — confirm against the current consented drawings, specifications, Auckland Council requirements, Auckland Unitary Plan, NZ Building Code, relevant NZ Standard, consultant advice, manufacturer instructions, insurance broker, insurer, lender, lawyer, accountant or project contract.