Request for Information

Ask a formal question when documents are unclear, missing, or conflicting.

Back to forms

When to use

Before making assumptions or changing work.

Completed by

Construction manager/subcontractor

Review / sign-off

Designer/engineer/project manager response authority

Private by design

A saved draft stays in this browser’s local storage. BuildPath NZ does not receive the entries. Clear shared devices after use and place exported records in the project’s controlled document system.

Evidence to attach

  • Marked-up drawing
  • Photos
  • Spec extract

Common mistakes

  • Writing vague notes such as 'all good' without location, drawing reference, trade, or evidence.
  • Leaving signature, date, revision, or responsible-person fields blank.
  • Filing the form in only one person's phone instead of the project record.
  • Using the form to approve a technical change without an RFI, designer/engineer instruction, minor variation, amendment, or contract approval where required.

Storage and document control

Store in the project document system under the matching folder: safety, quality, contract, council/CCC, handover, or site administration. Keep photos with the same date and location reference.

Source / Where to check

Check the current consented drawings and specifications, project contract, Auckland Council records and inspection requirements, MBIE Building Performance guidance, WorkSafe NZ guidance, relevant NZ Standard, consultant instructions, producer statements, product technical information, warranties, and manufacturer installation instructions.

Insufficient data to verify — confirm against the current consented drawings, specifications, Auckland Council requirements, Auckland Unitary Plan, NZ Building Code, relevant NZ Standard, consultant advice, manufacturer instructions, insurance broker, insurer, lender, lawyer, accountant or project contract.