Overland flow path conflict
Overland flow path conflict means the project cannot safely rely on the current assumption. Treat it as an open issue until the relevant evidence and authorised response agree.
A capacity, asset, level or approval constraint can force redesign, easements, public works, pumps, protection works or substantial civil cost. For overland flow path conflict, the response must follow current project documents and competent project-specific advice.
Cost impact
Record direct cost, professional fees, rework, delay, additional cover/premium, quote changes and contingency use. Obtain written pricing before approval where possible.
Programme impact
Identify the affected activity, hold point, critical-path relationship and required decision date. Update the short-term programme and notify affected trades.
Consent / compliance impact
Check the consented documents and obtain advice before changing approved work or a required inspection sequence.
Contract impact
Check responsibility, notice time, extension-of-time, variation, payment, suspension, defect and insurance provisions with the contract administrator or lawyer before asserting rights.
Safety impact
Reassess site risk before anyone investigates, protects, removes or reworks the affected item.
BuildPath NZ is an educational guide and project-management resource only. It does not replace advice from Auckland Council, a planner, architect, engineer, surveyor, quantity surveyor, lawyer, accountant, lender, insurer, insurance broker, WorkSafe, Watercare, utility provider, building consent authority or other qualified professional.
Insufficient data to verify — confirm against the current consented drawings, specifications, Auckland Council requirements, Auckland Unitary Plan, NZ Building Code, relevant NZ Standard, consultant advice, manufacturer instructions, insurance broker, insurer, lender, lawyer, accountant or project contract.