Site Admin · Free editable form
Risk register
A live list of planning, legal, finance, design, consent, construction, sales, settlement, and handover risks with owners and actions.
When to use
Use during all stages before giving instructions, approving spend, signing documents, waiving conditions, lodging consents, starting work, or making promises to lenders, council, consultants, builders, buyers, or clients.
Completed by
Developer or development manager
Review / sign-off
Project team at every meeting
Private by design
A saved draft stays in this browser’s local storage. BuildPath NZ does not receive the entries. Clear shared devices after use and place exported records in the project’s controlled document system.
BuildPath NZ · Educational project record
Risk register
Version 1 · Printed 15/08/2026
Prepared by / signature
Reviewed by / signature
Date
BuildPath NZ is an educational guide and project-management resource only. It does not replace advice from Auckland Council, a planner, architect, engineer, surveyor, quantity surveyor, lawyer, accountant, lender, insurer, insurance broker, WorkSafe, Watercare, utility provider, building consent authority or other qualified professional.
Evidence to attach
- Current feasibility or budget extract where relevant.
- Plans, sketches, maps, title/LIM/property file extracts, reports, quotes, photos, and emails relied on.
- Professional advice, meeting minutes, lender/council correspondence, and approval emails.
- Marked-up risk register or decision register entries.
Common mistakes
- Leaving assumptions unlabelled so they look like verified facts.
- Not recording the source document, date, version, or professional who confirmed the information.
- Approving a decision without showing cost, programme, risk, finance, or consent impact.
- Saving forms in email only instead of the project folder with document control.
Storage and document control
Save in the project document system under the related stage folder, with date, version number, preparer, reviewer, and approval status. Keep superseded versions in an archive folder.
Source / Where to check
Check the current consented drawings and specifications, project contract, Auckland Council records and inspection requirements, MBIE Building Performance guidance, WorkSafe NZ guidance, relevant NZ Standard, consultant instructions, producer statements, product technical information, warranties, and manufacturer installation instructions.
Insufficient data to verify — confirm against the current consented drawings, specifications, Auckland Council requirements, Auckland Unitary Plan, NZ Building Code, relevant NZ Standard, consultant advice, manufacturer instructions, insurance broker, insurer, lender, lawyer, accountant or project contract.
