Building Act 2004
Building consent, owner responsibilities, inspections, certificates and Building Code framework.
Applicability: Check the current Act and project-specific council requirements.
Last checked: 11 August 2026
Source / Where to check
This register shows where BuildPath guidance should be verified. Official web guidance can change; the latest approved project documents, authority records and competent professional advice still control the live decision.
If a chat message, site photo, old drawing or informal instruction conflicts with a current approved source, do not average the answers or choose the convenient one. Preserve both, identify their authority and revision, assign resolution, and hold affected work where safety, compliance, quality or irreversible cover-up is at risk.
Legislation
Building consent, owner responsibilities, inspections, certificates and Building Code framework.
Applicability: Check the current Act and project-specific council requirements.
Last checked: 11 August 2026
Primary health and safety duties and overlapping responsibilities.
Applicability: Remote monitoring does not replace competent on-site risk management.
Last checked: 11 August 2026
Payment claims, payment schedules and adjudication framework.
Applicability: Also check the signed contract and obtain legal advice where rights are disputed.
Last checked: 11 August 2026
National resource-management legislation within which planning and resource-consent processes operate.
Applicability: The RMA remains in force. The Planning Bill and Natural Environment Bill are reform proposals and must not be presented as current law. Check amendments, national direction, the Auckland Unitary Plan and the issued project decision.
Status: In force — reform transition active; Bills are not current law
Related topics: Planning, Resource consent, Land use
Last checked: 11 August 2026
Unit-title creation, body corporate governance, maintenance, insurance, developer control, disclosure and sale requirements.
Applicability: Use a property lawyer and surveyor for structure, disclosure, easements, body corporate and off-the-plans obligations. Check the current Act, regulations and project documents.
Status: In force — current legislation page checked
Related topics: Unit titles, Body corporate, Off-the-plans sale
Last checked: 11 August 2026
General property-law framework including interests, covenants, mortgages, leases and relief.
Applicability: Do not infer title, contractual or enforcement rights from BuildPath. Obtain current title/instruments and advice from a New Zealand property lawyer.
Status: In force — current legislation page checked
Related topics: Property rights, Covenants, Leases
Last checked: 11 August 2026
Misleading/deceptive conduct, unsubstantiated or false representations, land representations and unfair practices in trade.
Applicability: Project, marketing, price, approval, completion and product claims must be supported and not omit information that creates a misleading impression. Obtain legal advice for the actual transaction.
Status: In force — current page showed latest version from 1 July 2026
Related topics: Marketing, Sales, Representations
Last checked: 11 August 2026
Statutory guarantees and remedies for consumer goods and services, including reasonable care/skill, fitness, time and price where applicable.
Applicability: Whether the Act applies, or can be contracted out of for a business transaction, is transaction-specific. Check the contract and obtain legal advice.
Status: In force — current page showed latest version from 24 January 2026
Related topics: Residential building services, Defects, Consumer remedies
Last checked: 11 August 2026
Protection of archaeological sites and authority process for work that may modify or destroy a site.
Applicability: An archaeological site can be protected whether or not it is recorded. Obtain archaeology/Heritage New Zealand advice before potentially affected work and follow the project accidental-discovery protocol.
Status: In force — current legislation page checked
Related topics: Earthworks, Demolition, Archaeology, Heritage
Last checked: 11 August 2026
Prescribed forms used for building consent and completion processes, including Form 6 CCC application.
Applicability: Use the current prescribed form and council portal requirements. Do not substitute a BuildPath checklist for a statutory application or certificate.
Status: In force — version shown as at 15 January 2026
Related topics: Building consent, CCC, Prescribed forms
Last checked: 11 August 2026
Collection, use, storage, disclosure and access obligations for personal information in project records.
Applicability: Apply to contact data, chat imports, photos, access records and exports. IPP 3A changes took effect on 1 May 2026; obtain privacy advice for the actual use.
Effective date: IPP 3A effective 1 May 2026
Related topics: WhatsApp import, Project contacts, Evidence
Last checked: 11 August 2026
National regulator
Current Building Code clauses, Acceptable Solutions, Verification Methods and technical guidance.
Applicability: Use the pathway that applies to the actual design and consent.
Last checked: 11 August 2026
Build-to-consent, inspection and project-record expectations.
Applicability: Check the issued consent, amendments, minor variations and authority records for the project.
Last checked: 11 August 2026
Construction health and safety risk-management guidance.
Applicability: Use alongside the site-specific safety system and competent advice.
Last checked: 11 August 2026
Official status of RMA reform, amendment Acts, national direction and replacement Bills.
Applicability: Use this status page to distinguish in-force changes from Bills, announcements and proposed commencement. Verify again before publishing reform claims.
Status: Transition tracker — not a substitute for legislation
Related topics: Planning, National direction, RMA reform
Last checked: 11 August 2026
Official regulator guidance and templates for pre-contract, pre-settlement and turn-over disclosure and related unit-title processes.
Applicability: Confirm which prescribed or example document applies; use current legal advice before sale, settlement or body-corporate turnover.
Status: Current regulator guidance checked
Related topics: Disclosure, Settlement, Body corporate turnover
Last checked: 11 August 2026
Plain-language government guidance on accurate claims, pricing, advertising, services and consumer rights.
Applicability: Use as guidance only; current legislation, contract terms and professional advice control legal conclusions.
Status: Current government guidance checked
Related topics: Marketing, Building services, Complaints
Last checked: 11 August 2026
Current IRD overview of property GST registration and transaction considerations.
Applicability: Developing/building property can trigger GST obligations. Get a property tax adviser before signing an agreement or changing use; BuildPath does not calculate tax liability.
Status: Current IRD guidance — page last updated 30 May 2025
Related topics: GST, Property development, Sale and purchase
Last checked: 11 August 2026
Evidence to retain for property purchase, sale, fees, improvements and tax/GST reporting.
Applicability: Keep source records and follow current statutory retention rules and accountant advice for the entity and transaction.
Status: Current IRD guidance checked
Related topics: Tax records, Costs, GST
Last checked: 11 August 2026
Official CCC process guidance and Form 6 evidence context.
Applicability: Only the authorised building consent authority decides whether to issue the CCC. Use the actual consent, council requests and current form.
Status: Current regulator guidance checked
Related topics: CCC, Form 6, Close-out evidence
Last checked: 11 August 2026
Council / CCO
Local building consent, inspection, CCC and related council processes.
Applicability: Confirm current forms, portal steps, fees and project conditions directly with council.
Last checked: 11 August 2026
Resource consent applications, decisions, changes and monitoring.
Applicability: The issued decision, approved plans and conditions control the project.
Last checked: 11 August 2026
Zones, overlays, precincts, definitions and operative planning provisions.
Applicability: Check the current operative text, plan changes and property-specific mapping; page showed an update dated 12 June 2026 when reviewed.
Last checked: 11 August 2026
Council map layers used for early site screening.
Applicability: Map layers are screening inputs, not a survey, title opinion or guaranteed site condition.
Last checked: 11 August 2026
Water and wastewater development requirements and application pathways.
Applicability: Confirm current capacity, approvals, connection and Works Over requirements for the site.
Last checked: 11 August 2026
Land record
Current Record of Title and registered land instruments.
Applicability: Obtain the current title and instruments; use a lawyer or surveyor for legal or boundary interpretation.
Last checked: 11 August 2026
Standards body
Official product records, status, amendments, licensed access and copyright conditions for NZ and joint standards.
Applicability: Use the exact edition and amendments cited by the consent, design, law or contract. Do not use an uncontrolled or unlawfully copied standard.
Status: Official metadata and licensed access
Related topics: Structure, Durability, Electrical, Contracts
Last checked: 11 August 2026
Professional regulator
Official guidance on Records of Work for restricted building work.
Applicability: Confirm which work is restricted, the responsible LBP, timing and the council's project-specific close-out requirements.
Related topics: Restricted building work, CCC, Handover
Last checked: 11 August 2026
Electrical worker registration and certification guidance.
Applicability: Verify the worker and obtain the certification required for the actual electrical work; the project manager does not certify electrical safety.
Related topics: Electrical, Certification, Handover
Last checked: 11 August 2026
Official registration status for plumbers, gasfitters and drainlayers.
Applicability: Check the practitioner and licence class for the work and retain project certificates or records required by the consent and law.
Related topics: Plumbing, Gasfitting, Drainlaying
Last checked: 11 August 2026
Project-controlled source
The approved project scope, details, conditions, inspections and authorised changes.
Applicability: Check document number, revision, status and distribution before relying on it.
Last checked: Every decision
Scope, authority, notice, price, time, payment, risk and close-out obligations.
Applicability: Use the signed version and obtain professional advice where interpretation is disputed.
Last checked: Every commercial decision
Discipline-specific design, observation, response and certification.
Applicability: Confirm the author, competence, appointment scope, revision and any limitations.
Last checked: Every technical decision
Verification note: Link review confirms that an official source was available on the stated date. It does not verify a project-specific rule, consent requirement, engineering solution, contract interpretation, insurance position or site condition.