Who initiates it
Owner/applicant or authorised agent
Use the Flashing detail checklist to assemble, submit and control building-consent, inspection and CCC evidence against the current approved documents and authority process. It is a control aid, not a substitute for the current official, contractual or professionally prepared document where one governs.
Owner/applicant or authorised agent
Owner/applicant, authorised agent or relevant designer/consultant
The project manager and the person with technical, contractual or commercial authority for the subject
Auckland Council for consent/inspection/CCC decisions and authorised designers/trades for their certificates or producer statements
Use where building work requires the corresponding consent/inspection/close-out process; download current prescribed or council forms from the official source.
The project owner and the person controlling building consent and ccc, including each reviewer, approver or recipient named by the live project process.
Only the person with the authority or professional competence required by the source document, contract, insurer, lender or authority process.
Prepare before the related building consent and ccc decision or activity. Update it when scope, revision, cost, programme, responsibility, evidence or approval status changes.
Step-by-step
Keep as a controlled internal project record and issue by the contract or project communication method when another party must review, approve or act on it.
Save the authority receipt, answer RFIs against the controlled revision, update the approved set after decisions and maintain the CCC evidence index throughout construction.
Save the final record and supporting evidence in the controlled project document system, with the revision, issue status and related workspace record.
Confirm the project stage, contract, consent, consultant scope and actual site circumstances before use.
Consent Tracker / Document Register
Open Workspace areaBlank editable template
Free · saved in this browser
BuildPath NZ is an educational guide and project-management resource only. It does not replace advice from Auckland Council, a planner, architect, engineer, surveyor, quantity surveyor, lawyer, accountant, lender, insurer, insurance broker, WorkSafe, Watercare, utility provider, building consent authority or other qualified professional.
Verification
Use current official information and the controlled documents for the actual project.
Auckland Council explains local building consent processes, CCC, related certificates, producer statements, LBP notification, and whether resource consent may also be needed.
Use MBIE Building Performance to find the current Building Code clauses, Acceptable Solutions, Verification Methods, updates, and technical guidance.
MBIE guidance explains that work should be built to the issued building consent, inspections must be managed, and records/certificates should be kept for CCC.
The issued consent drawings, stamped specifications, engineering drawings, RFIs, minor variations, and amendments control the specific project.
Project-specific consented documents and professional advice override generic guidance.
BuildPath NZ is an educational guide and project-management resource only. It does not replace advice from Auckland Council, a planner, architect, engineer, surveyor, quantity surveyor, lawyer, accountant, lender, insurer, insurance broker, WorkSafe, Watercare, utility provider, building consent authority or other qualified professional.
Insufficient data to verify — confirm against the current consented drawings, specifications, Auckland Council requirements, Auckland Unitary Plan, NZ Building Code, relevant NZ Standard, consultant advice, manufacturer instructions, insurance broker, insurer, lender, lawyer, accountant or project contract.