Who initiates it
Project manager, lead designer or client/developer
Use the Design freeze record to define consultant deliverables and coordinate current design information across disciplines before issue, consent, procurement or construction. It is a control aid, not a substitute for the current official, contractual or professionally prepared document where one governs.
Project manager, lead designer or client/developer
Client/developer, project manager or delegated document owner
The project manager and the person with technical, contractual or commercial authority for the subject
Client/developer for scope/cost decisions and the responsible designer for technical design within their competence
Use from consultant appointment through design freeze and repeat at every coordinated issue or product/design change.
The project owner and the person controlling consultant engagement and design, including each reviewer, approver or recipient named by the live project process.
Only the person with the authority or professional competence required by the source document, contract, insurer, lender or authority process.
Prepare before the related consultant engagement and design decision or activity. Update it when scope, revision, cost, programme, responsibility, evidence or approval status changes.
Step-by-step
Issue through the relevant consultant engagement and document-control process; record the revision, date, recipient and response required.
Issue through document control, capture comments/approvals, supersede older revisions and flag every linked record relying on changed information.
Save the final record and supporting evidence in the controlled project document system, with the revision, issue status and related workspace record.
Confirm the project stage, contract, consent, consultant scope and actual site circumstances before use.
Document Management Register
Open Workspace areaBlank editable template
Free · saved in this browser
BuildPath NZ is an educational guide and project-management resource only. It does not replace advice from Auckland Council, a planner, architect, engineer, surveyor, quantity surveyor, lawyer, accountant, lender, insurer, insurance broker, WorkSafe, Watercare, utility provider, building consent authority or other qualified professional.
Verification
Use current official information and the controlled documents for the actual project.
Use the current project brief, approval authorities, issued drawings, specifications, contracts, consultant reports, programme, correspondence and controlled registers.
Planner, surveyor, architect, engineer, quantity surveyor, lawyer, accountant, lender, valuer, real estate agent, and other project specialists must confirm site-specific decisions.
Project-specific consented documents and professional advice override generic guidance.
BuildPath NZ is an educational guide and project-management resource only. It does not replace advice from Auckland Council, a planner, architect, engineer, surveyor, quantity surveyor, lawyer, accountant, lender, insurer, insurance broker, WorkSafe, Watercare, utility provider, building consent authority or other qualified professional.
Insufficient data to verify — confirm against the current consented drawings, specifications, Auckland Council requirements, Auckland Unitary Plan, NZ Building Code, relevant NZ Standard, consultant advice, manufacturer instructions, insurance broker, insurer, lender, lawyer, accountant or project contract.