Who initiates it
Client/developer through the civil engineer or authorised applicant
Use the Civil engineer briefing form to control civil, Watercare, council and utility evidence from due diligence through connection, inspection and as-built acceptance. It is a control aid, not a substitute for the current official, contractual or professionally prepared document where one governs.
Client/developer through the civil engineer or authorised applicant
Relevant engineer, coordinated by the project manager
The project manager and the person with technical, contractual or commercial authority for the subject
Relevant asset owner/authority and responsible engineer for their design or compliance statement
Use for the asset/connection/approval actually triggered by the property and design; confirm the current asset owner and application terminology.
The project owner and the person controlling engineering and infrastructure approvals, including each reviewer, approver or recipient named by the live project process.
Only the person with the authority or professional competence required by the source document, contract, insurer, lender or authority process.
Prepare before the related engineering and infrastructure approvals decision or activity. Update it when scope, revision, cost, programme, responsibility, evidence or approval status changes.
Step-by-step
Issue through the relevant consultant engagement and document-control process; record the revision, date, recipient and response required.
Track authority queries, protection and inspection hold points; retain as-builts and written acceptance before closing the work package.
Save the final record and supporting evidence in the controlled project document system, with the revision, issue status and related workspace record.
Confirm the project stage, contract, consent, consultant scope and actual site circumstances before use.
Consent Tracker / Document Register
Open Workspace areaBlank editable template
Free · saved in this browser
BuildPath NZ is an educational guide and project-management resource only. It does not replace advice from Auckland Council, a planner, architect, engineer, surveyor, quantity surveyor, lawyer, accountant, lender, insurer, insurance broker, WorkSafe, Watercare, utility provider, building consent authority or other qualified professional.
Verification
Use current official information and the controlled documents for the actual project.
Use GeoMaps as an early desktop check for property layers, contours, flooding/overland flow information, services context, and council spatial information. Confirm critical matters with professionals and council.
Use Watercare and civil engineering advice to verify water and wastewater connection requirements, network capacity, approvals, fees, and construction standards.
Use BeforeUdig and utility providers before intrusive investigations, demolition, earthworks, service trenches, or connection works.
Planner, surveyor, architect, engineer, quantity surveyor, lawyer, accountant, lender, valuer, real estate agent, and other project specialists must confirm site-specific decisions.
Project-specific consented documents and professional advice override generic guidance.
BuildPath NZ is an educational guide and project-management resource only. It does not replace advice from Auckland Council, a planner, architect, engineer, surveyor, quantity surveyor, lawyer, accountant, lender, insurer, insurance broker, WorkSafe, Watercare, utility provider, building consent authority or other qualified professional.
Insufficient data to verify — confirm against the current consented drawings, specifications, Auckland Council requirements, Auckland Unitary Plan, NZ Building Code, relevant NZ Standard, consultant advice, manufacturer instructions, insurance broker, insurer, lender, lawyer, accountant or project contract.