Who initiates it
Remote project manager or authorised reviewer
Use the Remote Site Verification Checklist to convert a precise remote information need into traceable evidence and, only after review, a controlled project record. It is a control aid, not a substitute for the current official, contractual or professionally prepared document where one governs.
Remote project manager or authorised reviewer
Client/developer, project manager or delegated document owner
The project manager and the person with technical, contractual or commercial authority for the subject
Authorised project decision-maker or competent reviewer for the underlying subject
Use where remote coordination is suitable. It does not replace physical inspection, authority records, testing or professional observation.
The project owner and the person controlling remote management across all stages, including each reviewer, approver or recipient named by the live project process.
Only the person with the authority or professional competence required by the source document, contract, insurer, lender or authority process.
Prepare before the related remote management across all stages decision or activity. Update it when scope, revision, cost, programme, responsibility, evidence or approval status changes.
Step-by-step
Keep as a controlled internal project record and issue by the contract or project communication method when another party must review, approve or act on it.
Send the evidence request, retain source IDs, review returned material, flag conflicts and create a formal record only after explicit user review/approval.
Save the controlled output in the project document system and link the source WhatsApp batch, message IDs, evidence records and resulting tasks/RFIs/variations/decisions.
Use the current project documents and formal authority records. Chat is evidence of what was communicated, not automatic proof or approval.
WhatsApp Project Control / Remote Inbox / Evidence / Commitments
Open Workspace areaBlank editable template
Free · saved in this browser
BuildPath NZ is an educational guide and project-management resource only. It does not replace advice from Auckland Council, a planner, architect, engineer, surveyor, quantity surveyor, lawyer, accountant, lender, insurer, insurance broker, WorkSafe, Watercare, utility provider, building consent authority or other qualified professional.
Verification
Use current official information and the controlled documents for the actual project.
Use the current project brief, approval authorities, issued drawings, specifications, contracts, consultant reports, programme, correspondence and controlled registers.
The issued consent drawings, stamped specifications, engineering drawings, RFIs, minor variations, and amendments control the specific project.
MBIE guidance explains that work should be built to the issued building consent, inspections must be managed, and records/certificates should be kept for CCC.
Use WorkSafe NZ for construction health and safety duties, risk management, and practical guidance for residential construction work.
Project-specific consented documents and professional advice override generic guidance.
BuildPath NZ is an educational guide and project-management resource only. It does not replace advice from Auckland Council, a planner, architect, engineer, surveyor, quantity surveyor, lawyer, accountant, lender, insurer, insurance broker, WorkSafe, Watercare, utility provider, building consent authority or other qualified professional.
Insufficient data to verify — confirm against the current consented drawings, specifications, Auckland Council requirements, Auckland Unitary Plan, NZ Building Code, relevant NZ Standard, consultant advice, manufacturer instructions, insurance broker, insurer, lender, lawyer, accountant or project contract.