Who initiates it
PCBU, site controller, main contractor or person managing the activity
Use the Safe Work Method Statement / task analysis to identify, coordinate and verify health-and-safety controls without replacing each PCBU's duties or competent risk assessment. It is a control aid, not a substitute for the current official, contractual or professionally prepared document where one governs.
PCBU, site controller, main contractor or person managing the activity
The PCBU, main contractor, site supervisor or competent worker responsible for the activity
The project manager and the person with technical, contractual or commercial authority for the subject
Responsible PCBU/competent person identified by the site's safety system
Use for the actual activity, people and overlapping duties. Follow current WorkSafe requirements and seek competent advice for high-risk or notifiable work/events.
The project owner and the person controlling health and safety planning and site work, including each reviewer, approver or recipient named by the live project process.
Only the person with the authority or professional competence required by the source document, contract, insurer, lender or authority process.
Prepare before the related health and safety planning and site work decision or activity. Update it when scope, revision, cost, programme, responsibility, evidence or approval status changes.
Step-by-step
Keep in the site health and safety system; send to WorkSafe or another party only when a current legal or contractual process requires it.
Brief affected people, verify controls before and during work, update after change and follow the current emergency/notification process when triggered.
Save the final record and supporting evidence in the controlled project document system, with the revision, issue status and related workspace record.
Confirm the project stage, contract, consent, consultant scope and actual site circumstances before use.
Task Management / Document Register
Open Workspace areaBlank editable template
Free · saved in this browser
BuildPath NZ is an educational guide and project-management resource only. It does not replace advice from Auckland Council, a planner, architect, engineer, surveyor, quantity surveyor, lawyer, accountant, lender, insurer, insurance broker, WorkSafe, Watercare, utility provider, building consent authority or other qualified professional.
Verification
Use current official information and the controlled documents for the actual project.
Use WorkSafe NZ for construction health and safety duties, risk management, and practical guidance for residential construction work.
Use before demolition, refurbishment, or disturbance of possible asbestos-containing material.
Use the current project brief, approval authorities, issued drawings, specifications, contracts, consultant reports, programme, correspondence and controlled registers.
Project-specific consented documents and professional advice override generic guidance.
BuildPath NZ is an educational guide and project-management resource only. It does not replace advice from Auckland Council, a planner, architect, engineer, surveyor, quantity surveyor, lawyer, accountant, lender, insurer, insurance broker, WorkSafe, Watercare, utility provider, building consent authority or other qualified professional.
Insufficient data to verify — confirm against the current consented drawings, specifications, Auckland Council requirements, Auckland Unitary Plan, NZ Building Code, relevant NZ Standard, consultant advice, manufacturer instructions, insurance broker, insurer, lender, lawyer, accountant or project contract.