Site constraints review
This stage brings slope, flooding, overland flow, trees, access, neighbours, demolition, geotechnical, and buildability constraints into one risk picture. This page shows what a beginner residential developer in Auckland should check, who to ask, what evidence to save, and where to verify before committing money or instructions.
How to execute this stage
Micro-stage control plan
Work through each applicable step in order. A hold point means pause the dependent decision or work until the stated evidence and authorised review are complete.
01SlopeLevel 2 · Due diligence
TaskCheckHold pointEvidenceRecordNext actionSimple explanation
Slope
Technical context
Test this point against Constraints plan, the current feasibility version and written input from Planner. Separate verified facts, professional opinion and assumptions.
Why it matters: This check can change yield, consent pathway, acquisition terms, funding, cost, programme or exit strategy. It must be resolved before the developer relies on whether the site remains suitable.
Prerequisites
- Constraints plan is current and its source/date are recorded.
- The project objective, feasibility version and decision deadline are clear.
- Planner has a focused brief where professional confirmation is required.
Checks
- Does Constraints plan directly support the conclusion?
- Which information is verified, assumed, missing, superseded or contradictory?
- Has the feasibility, programme, risk register and decision register been updated?
Evidence to save
- Constraints plan
- Written Planner response or a recorded reason it is not required
- Dated feasibility/risk/decision update
Hold point
Do not waive a condition, instruct design/work, commit funding, lodge, purchase, settle or represent the conclusion as confirmed until the authorised decision-maker has the required evidence and advice.
Stop or escalate when
- The source is missing, old, inconsistent or outside the reviewer's scope.
- The check changes yield, approval pathway, funding, legal rights, tax, safety or a material cost/programme assumption.
- A deadline is approaching and the responsible professional has not confirmed the position.
Documents and records
- Constraints plan
- Site assessment checklist
- Due diligence checklist
- Current feasibility, risk register and decision register
- Cost effect
- Record changes to land value, consultant/council cost, construction/civil cost, finance, holding cost, contingency and exit value before whether the site remains suitable.
- Programme effect
- Record the decision deadline, dependencies, information lead time and effect on acquisition, consent, procurement, construction, sales or settlement milestones.
Next action
contours
Applicability: Confirm whether this check applies to the actual site, ownership, strategy, consent pathway, infrastructure and delivery model; record a reason when not applicable.
Use current site-specific documents and appropriately appointed professional advice. BuildPath does not make the development decision for you.
02contoursLevel 2 · Due diligence
TaskCheckHold pointEvidenceRecordNext actionSimple explanation
contours
Technical context
Test this point against Topographical survey, the current feasibility version and written input from Surveyor. Separate verified facts, professional opinion and assumptions.
Why it matters: This check can change yield, consent pathway, acquisition terms, funding, cost, programme or exit strategy. It must be resolved before the developer relies on what investigations are needed.
Prerequisites
- Topographical survey is current and its source/date are recorded.
- The project objective, feasibility version and decision deadline are clear.
- Surveyor has a focused brief where professional confirmation is required.
Checks
- Does Topographical survey directly support the conclusion?
- Which information is verified, assumed, missing, superseded or contradictory?
- Has the feasibility, programme, risk register and decision register been updated?
Evidence to save
- Topographical survey
- Written Surveyor response or a recorded reason it is not required
- Dated feasibility/risk/decision update
Hold point
Do not waive a condition, instruct design/work, commit funding, lodge, purchase, settle or represent the conclusion as confirmed until the authorised decision-maker has the required evidence and advice.
Stop or escalate when
- The source is missing, old, inconsistent or outside the reviewer's scope.
- The check changes yield, approval pathway, funding, legal rights, tax, safety or a material cost/programme assumption.
- A deadline is approaching and the responsible professional has not confirmed the position.
Documents and records
- Topographical survey
- Site assessment checklist
- Due diligence checklist
- Current feasibility, risk register and decision register
- Cost effect
- Record changes to land value, consultant/council cost, construction/civil cost, finance, holding cost, contingency and exit value before what investigations are needed.
- Programme effect
- Record the decision deadline, dependencies, information lead time and effect on acquisition, consent, procurement, construction, sales or settlement milestones.
Next action
flooding
Applicability: Confirm whether this check applies to the actual site, ownership, strategy, consent pathway, infrastructure and delivery model; record a reason when not applicable.
Use current site-specific documents and appropriately appointed professional advice. BuildPath does not make the development decision for you.
03floodingLevel 2 · Due diligence
TaskCheckHold pointEvidenceRecordNext actionSimple explanation
flooding
Technical context
Test this point against GeoMaps screenshots, the current feasibility version and written input from Geotechnical engineer. Separate verified facts, professional opinion and assumptions.
Why it matters: This check can change yield, consent pathway, acquisition terms, funding, cost, programme or exit strategy. It must be resolved before the developer relies on what costs must be carried.
Prerequisites
- GeoMaps screenshots is current and its source/date are recorded.
- The project objective, feasibility version and decision deadline are clear.
- Geotechnical engineer has a focused brief where professional confirmation is required.
Checks
- Does GeoMaps screenshots directly support the conclusion?
- Which information is verified, assumed, missing, superseded or contradictory?
- Has the feasibility, programme, risk register and decision register been updated?
Evidence to save
- GeoMaps screenshots
- Written Geotechnical engineer response or a recorded reason it is not required
- Dated feasibility/risk/decision update
Hold point
Do not waive a condition, instruct design/work, commit funding, lodge, purchase, settle or represent the conclusion as confirmed until the authorised decision-maker has the required evidence and advice.
Stop or escalate when
- The source is missing, old, inconsistent or outside the reviewer's scope.
- The check changes yield, approval pathway, funding, legal rights, tax, safety or a material cost/programme assumption.
- A deadline is approaching and the responsible professional has not confirmed the position.
Documents and records
- GeoMaps screenshots
- Site assessment checklist
- Due diligence checklist
- Current feasibility, risk register and decision register
- Cost effect
- Record changes to land value, consultant/council cost, construction/civil cost, finance, holding cost, contingency and exit value before what costs must be carried.
- Programme effect
- Record the decision deadline, dependencies, information lead time and effect on acquisition, consent, procurement, construction, sales or settlement milestones.
Next action
overland flow
Applicability: Confirm whether this check applies to the actual site, ownership, strategy, consent pathway, infrastructure and delivery model; record a reason when not applicable.
Use current site-specific documents and appropriately appointed professional advice. BuildPath does not make the development decision for you.
04overland flowLevel 2 · Due diligence
TaskCheckHold pointEvidenceRecordNext actionSimple explanation
overland flow
Technical context
Test this point against Geotech notes, the current feasibility version and written input from Civil engineer. Separate verified facts, professional opinion and assumptions.
Why it matters: This check can change yield, consent pathway, acquisition terms, funding, cost, programme or exit strategy. It must be resolved before the developer relies on whether the site remains suitable.
Prerequisites
- Geotech notes is current and its source/date are recorded.
- The project objective, feasibility version and decision deadline are clear.
- Civil engineer has a focused brief where professional confirmation is required.
Checks
- Does Geotech notes directly support the conclusion?
- Which information is verified, assumed, missing, superseded or contradictory?
- Has the feasibility, programme, risk register and decision register been updated?
Evidence to save
- Geotech notes
- Written Civil engineer response or a recorded reason it is not required
- Dated feasibility/risk/decision update
Hold point
Do not waive a condition, instruct design/work, commit funding, lodge, purchase, settle or represent the conclusion as confirmed until the authorised decision-maker has the required evidence and advice.
Stop or escalate when
- The source is missing, old, inconsistent or outside the reviewer's scope.
- The check changes yield, approval pathway, funding, legal rights, tax, safety or a material cost/programme assumption.
- A deadline is approaching and the responsible professional has not confirmed the position.
Documents and records
- Geotech notes
- Site assessment checklist
- Due diligence checklist
- Current feasibility, risk register and decision register
- Cost effect
- Record changes to land value, consultant/council cost, construction/civil cost, finance, holding cost, contingency and exit value before whether the site remains suitable.
- Programme effect
- Record the decision deadline, dependencies, information lead time and effect on acquisition, consent, procurement, construction, sales or settlement milestones.
Next action
trees
Applicability: Confirm whether this check applies to the actual site, ownership, strategy, consent pathway, infrastructure and delivery model; record a reason when not applicable.
Use current site-specific documents and appropriately appointed professional advice. BuildPath does not make the development decision for you.
05treesLevel 2 · Due diligence
TaskCheckHold pointEvidenceRecordNext actionSimple explanation
trees
Technical context
Test this point against Civil notes, the current feasibility version and written input from Architect. Separate verified facts, professional opinion and assumptions.
Why it matters: This check can change yield, consent pathway, acquisition terms, funding, cost, programme or exit strategy. It must be resolved before the developer relies on what investigations are needed.
Prerequisites
- Civil notes is current and its source/date are recorded.
- The project objective, feasibility version and decision deadline are clear.
- Architect has a focused brief where professional confirmation is required.
Checks
- Does Civil notes directly support the conclusion?
- Which information is verified, assumed, missing, superseded or contradictory?
- Has the feasibility, programme, risk register and decision register been updated?
Evidence to save
- Civil notes
- Written Architect response or a recorded reason it is not required
- Dated feasibility/risk/decision update
Hold point
Do not waive a condition, instruct design/work, commit funding, lodge, purchase, settle or represent the conclusion as confirmed until the authorised decision-maker has the required evidence and advice.
Stop or escalate when
- The source is missing, old, inconsistent or outside the reviewer's scope.
- The check changes yield, approval pathway, funding, legal rights, tax, safety or a material cost/programme assumption.
- A deadline is approaching and the responsible professional has not confirmed the position.
Documents and records
- Civil notes
- Site assessment checklist
- Due diligence checklist
- Current feasibility, risk register and decision register
- Cost effect
- Record changes to land value, consultant/council cost, construction/civil cost, finance, holding cost, contingency and exit value before what investigations are needed.
- Programme effect
- Record the decision deadline, dependencies, information lead time and effect on acquisition, consent, procurement, construction, sales or settlement milestones.
Next action
existing structures
Applicability: Confirm whether this check applies to the actual site, ownership, strategy, consent pathway, infrastructure and delivery model; record a reason when not applicable.
Use current site-specific documents and appropriately appointed professional advice. BuildPath does not make the development decision for you.
06existing structuresLevel 2 · Due diligence
TaskCheckHold pointEvidenceRecordNext actionSimple explanation
existing structures
Technical context
Test this point against Photo record, the current feasibility version and written input from Builder. Separate verified facts, professional opinion and assumptions.
Why it matters: This check can change yield, consent pathway, acquisition terms, funding, cost, programme or exit strategy. It must be resolved before the developer relies on what costs must be carried.
Prerequisites
- Photo record is current and its source/date are recorded.
- The project objective, feasibility version and decision deadline are clear.
- Builder has a focused brief where professional confirmation is required.
Checks
- Does Photo record directly support the conclusion?
- Which information is verified, assumed, missing, superseded or contradictory?
- Has the feasibility, programme, risk register and decision register been updated?
Evidence to save
- Photo record
- Written Builder response or a recorded reason it is not required
- Dated feasibility/risk/decision update
Hold point
Do not waive a condition, instruct design/work, commit funding, lodge, purchase, settle or represent the conclusion as confirmed until the authorised decision-maker has the required evidence and advice.
Stop or escalate when
- The source is missing, old, inconsistent or outside the reviewer's scope.
- The check changes yield, approval pathway, funding, legal rights, tax, safety or a material cost/programme assumption.
- A deadline is approaching and the responsible professional has not confirmed the position.
Documents and records
- Photo record
- Site assessment checklist
- Due diligence checklist
- Current feasibility, risk register and decision register
- Cost effect
- Record changes to land value, consultant/council cost, construction/civil cost, finance, holding cost, contingency and exit value before what costs must be carried.
- Programme effect
- Record the decision deadline, dependencies, information lead time and effect on acquisition, consent, procurement, construction, sales or settlement milestones.
Next action
access
Applicability: Confirm whether this check applies to the actual site, ownership, strategy, consent pathway, infrastructure and delivery model; record a reason when not applicable.
Use current site-specific documents and appropriately appointed professional advice. BuildPath does not make the development decision for you.
07accessLevel 2 · Due diligence
TaskCheckHold pointEvidenceRecordNext actionSimple explanation
access
Technical context
Test this point against Constraints plan, the current feasibility version and written input from Quantity surveyor. Separate verified facts, professional opinion and assumptions.
Why it matters: This check can change yield, consent pathway, acquisition terms, funding, cost, programme or exit strategy. It must be resolved before the developer relies on whether the site remains suitable.
Prerequisites
- Constraints plan is current and its source/date are recorded.
- The project objective, feasibility version and decision deadline are clear.
- Quantity surveyor has a focused brief where professional confirmation is required.
Checks
- Does Constraints plan directly support the conclusion?
- Which information is verified, assumed, missing, superseded or contradictory?
- Has the feasibility, programme, risk register and decision register been updated?
Evidence to save
- Constraints plan
- Written Quantity surveyor response or a recorded reason it is not required
- Dated feasibility/risk/decision update
Hold point
Do not waive a condition, instruct design/work, commit funding, lodge, purchase, settle or represent the conclusion as confirmed until the authorised decision-maker has the required evidence and advice.
Stop or escalate when
- The source is missing, old, inconsistent or outside the reviewer's scope.
- The check changes yield, approval pathway, funding, legal rights, tax, safety or a material cost/programme assumption.
- A deadline is approaching and the responsible professional has not confirmed the position.
Documents and records
- Constraints plan
- Site assessment checklist
- Due diligence checklist
- Current feasibility, risk register and decision register
- Cost effect
- Record changes to land value, consultant/council cost, construction/civil cost, finance, holding cost, contingency and exit value before whether the site remains suitable.
- Programme effect
- Record the decision deadline, dependencies, information lead time and effect on acquisition, consent, procurement, construction, sales or settlement milestones.
Next action
neighbouring properties
Applicability: Confirm whether this check applies to the actual site, ownership, strategy, consent pathway, infrastructure and delivery model; record a reason when not applicable.
Use current site-specific documents and appropriately appointed professional advice. BuildPath does not make the development decision for you.
08neighbouring propertiesLevel 2 · Due diligence
TaskCheckHold pointEvidenceRecordNext actionSimple explanation
neighbouring properties
Technical context
Test this point against Topographical survey, the current feasibility version and written input from Planner. Separate verified facts, professional opinion and assumptions.
Why it matters: This check can change yield, consent pathway, acquisition terms, funding, cost, programme or exit strategy. It must be resolved before the developer relies on what investigations are needed.
Prerequisites
- Topographical survey is current and its source/date are recorded.
- The project objective, feasibility version and decision deadline are clear.
- Planner has a focused brief where professional confirmation is required.
Checks
- Does Topographical survey directly support the conclusion?
- Which information is verified, assumed, missing, superseded or contradictory?
- Has the feasibility, programme, risk register and decision register been updated?
Evidence to save
- Topographical survey
- Written Planner response or a recorded reason it is not required
- Dated feasibility/risk/decision update
Hold point
Do not waive a condition, instruct design/work, commit funding, lodge, purchase, settle or represent the conclusion as confirmed until the authorised decision-maker has the required evidence and advice.
Stop or escalate when
- The source is missing, old, inconsistent or outside the reviewer's scope.
- The check changes yield, approval pathway, funding, legal rights, tax, safety or a material cost/programme assumption.
- A deadline is approaching and the responsible professional has not confirmed the position.
Documents and records
- Topographical survey
- Site assessment checklist
- Due diligence checklist
- Current feasibility, risk register and decision register
- Cost effect
- Record changes to land value, consultant/council cost, construction/civil cost, finance, holding cost, contingency and exit value before what investigations are needed.
- Programme effect
- Record the decision deadline, dependencies, information lead time and effect on acquisition, consent, procurement, construction, sales or settlement milestones.
Next action
sun/shading/privacy
Applicability: Confirm whether this check applies to the actual site, ownership, strategy, consent pathway, infrastructure and delivery model; record a reason when not applicable.
Use current site-specific documents and appropriately appointed professional advice. BuildPath does not make the development decision for you.
09sun/shading/privacyLevel 2 · Due diligence
TaskCheckHold pointEvidenceRecordNext actionSimple explanation
sun/shading/privacy
Technical context
Test this point against GeoMaps screenshots, the current feasibility version and written input from Surveyor. Separate verified facts, professional opinion and assumptions.
Why it matters: This check can change yield, consent pathway, acquisition terms, funding, cost, programme or exit strategy. It must be resolved before the developer relies on what costs must be carried.
Prerequisites
- GeoMaps screenshots is current and its source/date are recorded.
- The project objective, feasibility version and decision deadline are clear.
- Surveyor has a focused brief where professional confirmation is required.
Checks
- Does GeoMaps screenshots directly support the conclusion?
- Which information is verified, assumed, missing, superseded or contradictory?
- Has the feasibility, programme, risk register and decision register been updated?
Evidence to save
- GeoMaps screenshots
- Written Surveyor response or a recorded reason it is not required
- Dated feasibility/risk/decision update
Hold point
Do not waive a condition, instruct design/work, commit funding, lodge, purchase, settle or represent the conclusion as confirmed until the authorised decision-maker has the required evidence and advice.
Stop or escalate when
- The source is missing, old, inconsistent or outside the reviewer's scope.
- The check changes yield, approval pathway, funding, legal rights, tax, safety or a material cost/programme assumption.
- A deadline is approaching and the responsible professional has not confirmed the position.
Documents and records
- GeoMaps screenshots
- Site assessment checklist
- Due diligence checklist
- Current feasibility, risk register and decision register
- Cost effect
- Record changes to land value, consultant/council cost, construction/civil cost, finance, holding cost, contingency and exit value before what costs must be carried.
- Programme effect
- Record the decision deadline, dependencies, information lead time and effect on acquisition, consent, procurement, construction, sales or settlement milestones.
Next action
Make and record the stage decision: What costs must be carried. Then open the next applicable development stage.
Applicability: Confirm whether this check applies to the actual site, ownership, strategy, consent pathway, infrastructure and delivery model; record a reason when not applicable.
Use current site-specific documents and appropriately appointed professional advice. BuildPath does not make the development decision for you.
Developer go / no-go control
Decision gates before the next commitment
A gate records whether evidence supports a commercial decision. It does not replace advice or predict an authority, lender, purchaser or market outcome.
Before going unconditional or settling
Decision: Proceed, renegotiate, extend, or withdraw under professional advice
Minimum evidence
- • Lawyer confirms title and agreement matters within scope
- • Planner/design/engineering advice supports a credible pathway
- • Funding, valuation, insurance and cash requirements are evidenced
Update before deciding
- • Acquisition and holding costs
- • Confirmed investigation/design/authority allowances
- • Settlement-to-revenue cashflow and contingency
Stop / escalate when
- • A critical report/approval is outstanding at the condition deadline
- • Feasibility fails the agreed downside threshold
- • Conflicting advice is unresolved
What this stage means
- Site constraints review is the part of the project where the developer turns an idea into a checked decision, not a guess.
- The stage should connect market demand, planning rules, legal constraints, design, cost, funding, time, risk, and exit strategy.
- For Auckland residential development, the answer is site-specific. The same idea can be low risk on one site and unworkable on the next because of zoning, overlays, title interests, services, slope, flooding, neighbours, or finance.
Why this stage matters
- Early mistakes become expensive because land, design, consultants, holding costs, consent fees, and finance costs continue even when the project is paused.
- The developer needs written evidence for lenders, consultants, lawyers, valuers, builders, purchasers, and future dispute protection.
- This stage usually needs verification from Auckland Council GeoMaps, Auckland Unitary Plan maps, Relevant professional advice before the developer treats the conclusion as reliable.
Step-by-step guide
- 1Define the decision needed at the end of this stage and the date it is needed by.
- 2Gather the stage documents: Constraints plan, Topographical survey, GeoMaps screenshots, Geotech notes, and the remaining stage records.
- 3Read the documents once for understanding, then again to list unknowns, risks, contradictions, missing evidence, and professional questions.
- 4Ask the responsible professionals to confirm the critical points: Planner, Surveyor, Geotechnical engineer, Civil engineer.
- 5Update the feasibility, programme, risk register, and decision register with source references and dates.
- 6Decide whether to proceed, pause, redesign, renegotiate, add conditions, seek more advice, or abandon the option.
- 7Save the evidence in a dated folder and write a short stage closeout note explaining what was decided and why.
What the developer must do
- Write down the development objective for site constraints review in one clear paragraph: build-to-sell, build-to-rent, retain one dwelling, subdivide, renovate, or staged development.
- Open the current feasibility, programme, decision register, risk register, and due diligence folder before making new commitments.
- Collect the documents needed for this stage: Constraints plan, Topographical survey, GeoMaps screenshots, Geotech notes, Civil notes, Photo record.
- Send focused questions to the right people: Planner, Surveyor, Geotechnical engineer, Civil engineer, Architect, Builder, Quantity surveyor.
- Record assumptions separately from verified facts so the feasibility does not look more certain than it really is.
- Update cost, time, consent, finance, and sales assumptions immediately after receiving new information.
- Escalate anything that changes yield, sale price, cost, timing, consent pathway, title, funding, or settlement risk.
Verification
Source / where to check
Use current official information and the controlled documents for the actual project.
Use GeoMaps as an early desktop check for property layers, contours, flooding/overland flow information, services context, and council spatial information. Confirm critical matters with professionals and council.
Use the plan maps to confirm site-specific zoning, overlays, precincts, controls, designations, natural hazards, and planning layers before relying on generic guidance.
Planner, surveyor, architect, engineer, quantity surveyor, lawyer, accountant, lender, valuer, real estate agent, and other project specialists must confirm site-specific decisions.
Project-specific consented documents and professional advice override generic guidance.
Common mistakes
- Treating an agent comment, generic online rule, or old document as verified site-specific advice.
- Forgetting to update the feasibility after design, consent, finance, or market information changes.
- Not allowing enough contingency, professional fees, council fees, finance costs, holding costs, and time risk.
- Failing to keep written records of who confirmed what and when.
- Using site constraints review to push ahead even when the red flags show the project should pause.
Common risks
- Yield reduces after proper planning, engineering, title, or infrastructure review.
- Costs increase after QS, builder, civil, geotechnical, demolition, asbestos, or consent information is received.
- Programme moves out because consultant inputs, council RFIs, neighbour issues, finance, title, or construction sequencing take longer than assumed.
- Funding or sales assumptions change before the project reaches settlement.
- The developer relies on unverified information and loses negotiating power or misses a due diligence deadline.
Common costs
- Professional fees for planner, architect/designer, surveyor, engineer, QS, lawyer, accountant, valuer, and lender reports.
- Council fees, consent fees, development contribution estimates, engineering approvals, infrastructure checks, and inspection/monitoring costs where relevant.
- Design revisions, reports, investigations, demolition/asbestos work, service location, geotechnical testing, and valuation updates.
- Holding costs such as interest, rates, insurance, utilities, temporary maintenance, and security.
- Contingency for unverified conditions until the relevant professional confirms them.
Quotes and fee proposals to obtain
- Obtain written fee proposals or quotations from the relevant stage professionals: Planner, Surveyor, Geotechnical engineer, Civil engineer, Architect, Builder, Quantity surveyor.
- Issue the same current documents and a clear scope to each party so prices, exclusions, assumptions, deliverables, lead times, and programme can be compared.
- Identify council, authority, investigation, testing, design, construction, monitoring, and close-out charges that may sit outside a consultant or contractor quote.
- Record every provisional sum, estimate, exclusion, expiry date, dependency, and unverified allowance in the Quote Register and feasibility.
- Do not approve an appointment or purchase order until scope ownership, evidence required, payment terms, variation process, insurance or competency checks, and completion deliverables are understood.
Common delays
- Waiting for property file, LIM, title instruments, survey information, consultant reports, or council responses.
- Design changes caused by planning controls, infrastructure constraints, engineering findings, budget pressure, or market feedback.
- Lender, valuer, lawyer, or purchaser conditions not being satisfied on time.
- Council RFI responses needing more consultant work than expected.
- Construction or subdivision closeout documents not matching settlement or sales deadlines.
Common consultant questions
- For Site constraints review, what are the three highest risks that could change cost, time, yield, or approval pathway?
- Which parts of your advice are confirmed, which are assumptions, and which require another professional to confirm?
- What documents did you rely on, and are any documents missing, outdated, superseded, or inconsistent?
- What decision does the developer need to make now, and what should wait until more information is available?
- What wording should go into the decision register, consultant meeting minutes, or lender/client update?
Red flags
- A professional says the issue is outside their scope and no one else has been asked to confirm it.
- The feasibility only works if optimistic sale prices, low construction costs, fast consent, low interest, and no delays all happen together.
- A title, planning, flooding, geotechnical, access, service, or covenant issue may prevent the intended yield.
- A seller, agent, builder, or consultant pressures the developer to waive due diligence before core checks are complete.
- The project file has no written evidence for a major decision.
When to stop and get professional advice
- Stop and get professional advice when title, easements, covenants, unit title, cross lease, or subdivision matters affect the proposal.
- Stop and get professional advice when zoning, overlays, activity status, notification, infrastructure capacity, flooding, geotechnical, contamination, or heritage could affect yield.
- Stop and get professional advice when GST, income tax, entity structure, lending, guarantees, or sale contract terms affect the decision.
- Stop and get professional advice when the developer is about to sign, waive a condition, lodge consent, start work, approve a variation, accept practical completion, or settle.
Decisions that must be made
- Whether the site remains suitable
- What investigations are needed
- What costs must be carried
Evidence to save
- Dated source documents and consultant advice.
- Feasibility version showing the assumptions used at the time of decision.
- Risk register and decision register entries.
- Meeting notes, emails, marked-up plans, calculations, photos, and council/lender/consultant responses.
- Clear note of who approved the next step and any conditions attached to that approval.
Beginner-friendly example
The site looks flat from the street, but the topo survey shows a rear fall that affects driveway gradient and retaining cost.
Use this in my project
Turn site constraints review into controlled action
Open the relevant workspace register, create the project-specific record, link the controlling documents and preserve evidence. The guide does not automatically approve or verify the action.