BuildPath NZ logo

Planning

Building consent documents review

Create a buildable control set from the issued building consent, stamped documents, inspections, certificates, and change requirements.

building consentdocument reviewstamped drawingsCCC6 common tradesLast reviewed 11 August 2026

How to execute this stage

Micro-stage control plan

Work through each applicable step in order. A hold point means pause the dependent decision or work until the stated evidence and authorised review are complete.

3 structured steps
  1. 01Confirm the consent number, scope, issued date, approved document list, stamped revisions, specified inspections, and supporting reportsLevel 1 · Planning
    TaskCheckHold pointEvidenceRecordNext action

    Simple explanation

    Confirm the consent number, scope, issued date, approved document list, stamped revisions, specified inspections, and supporting reports.

    Technical context

    Coordinate this work against Consented architectural, structural, civil, drainage, H1, and specialist documents, Stamped specification, the current consent status, and the actual site condition. Confirm interfaces before releasing dependent work.

    Why it matters: The main recorded risk is: Work built from tender drawings. A missed check can create rework, delay, hidden defects, an inspection failure, or a departure from approved project documents.

    Prerequisites

    • Consented architectural, structural, civil, drainage, H1, and specialist documents is current, approved for the intended use, and available to the people doing the work.
    • Stamped specification and relevant product information have been checked.
    • Access, responsibility, safety controls, preceding work and the pre-construction consent review sequence are confirmed.

    Checks

    • Check the completed work against Consented architectural, structural, civil, drainage, H1, and specialist documents and Stamped specification.
    • Check specifically for: Work built from tender drawings.
    • Avoid this known mistake: Starting building consent documents review without confirming the current documents and responsibility.

    Evidence to save

    • Wide, location-identifying and close-up photographs of the completed building consent documents review work before it is concealed.
    • Marked-up Consented architectural, structural, civil, drainage, H1, and specialist documents or a precise drawing/detail reference.
    • Pre-construction consent review result, consultant record, trade QA record or written not-applicable reason.

    Hold point

    Do not cover, backfill, load, connect, certify or release the next activity until Pre-construction consent review and the required project evidence are complete or the authorised reviewer confirms what may proceed.

    Stop or escalate when

    • Work built from tender drawings
    • Starting building consent documents review without confirming the current documents and responsibility
    • The current drawing, approval, competent reviewer or required evidence cannot be confirmed.

    Documents and records

    • Consented architectural, structural, civil, drainage, H1, and specialist documents
    • Stamped specification
    • Current RFI/site-instruction/change record
    • Inspection and evidence register
    Cost effect
    Rectification, reinspection, delay, damaged follow-on work, access loss and changed scope can increase the cost of building consent documents review. Record the cause and obtain written pricing before approving a commercial change.
    Programme effect
    This activity controls the release of dependent work. Update the lookahead programme and notify affected trades if the hold point, information, inspection or evidence is not ready.

    Next action

    Build an inspection and CCC evidence matrix covering producer statements, Records of Work, certificates, as-builts, warranties, and product evidence.

    Applicability: Apply when this work package is included in the current project scope. Confirm project-specific consent, contract, design, site and authority requirements.

    Use the current consented/issued project documents and competent site review. BuildPath does not approve work.

  2. 02Build an inspection and CCC evidence matrix covering producer statements, Records of Work, certificates, as-builts, warranties, and product evidenceLevel 1 · Planning
    TaskCheckHold pointEvidenceRecordNext action

    Simple explanation

    Build an inspection and CCC evidence matrix covering producer statements, Records of Work, certificates, as-builts, warranties, and product evidence.

    Technical context

    Coordinate this work against Consented architectural, structural, civil, drainage, H1, and specialist documents, Approved calculations, the current consent status, and the actual site condition. Confirm interfaces before releasing dependent work.

    Why it matters: The main recorded risk is: Consent scope misunderstood. A missed check can create rework, delay, hidden defects, an inspection failure, or a departure from approved project documents.

    Prerequisites

    • Consented architectural, structural, civil, drainage, H1, and specialist documents is current, approved for the intended use, and available to the people doing the work.
    • Approved calculations and relevant product information have been checked.
    • Access, responsibility, safety controls, preceding work and the bca inspection sequence review sequence are confirmed.

    Checks

    • Check the completed work against Consented architectural, structural, civil, drainage, H1, and specialist documents and Approved calculations.
    • Check specifically for: Consent scope misunderstood.
    • Avoid this known mistake: Relying on a verbal answer without recording the source, decision, owner, and due date.

    Evidence to save

    • Wide, location-identifying and close-up photographs of the completed building consent documents review work before it is concealed.
    • Marked-up Consented architectural, structural, civil, drainage, H1, and specialist documents or a precise drawing/detail reference.
    • BCA inspection sequence review result, consultant record, trade QA record or written not-applicable reason.

    Hold point

    Do not cover, backfill, load, connect, certify or release the next activity until BCA inspection sequence review and the required project evidence are complete or the authorised reviewer confirms what may proceed.

    Stop or escalate when

    • Consent scope misunderstood
    • Relying on a verbal answer without recording the source, decision, owner, and due date
    • The current drawing, approval, competent reviewer or required evidence cannot be confirmed.

    Documents and records

    • Consented architectural, structural, civil, drainage, H1, and specialist documents
    • Approved calculations
    • Current RFI/site-instruction/change record
    • Inspection and evidence register
    Cost effect
    Rectification, reinspection, delay, damaged follow-on work, access loss and changed scope can increase the cost of building consent documents review. Record the cause and obtain written pricing before approving a commercial change.
    Programme effect
    This activity controls the release of dependent work. Update the lookahead programme and notify affected trades if the hold point, information, inspection or evidence is not ready.

    Next action

    Identify unclear or conflicting details and raise RFIs before procurement or site work relies on an assumption.

    Applicability: Apply when this work package is included in the current project scope. Confirm project-specific consent, contract, design, site and authority requirements.

    Use the current consented/issued project documents and competent site review. BuildPath does not approve work.

  3. 03Identify unclear or conflicting details and raise RFIs before procurement or site work relies on an assumptionLevel 1 · Planning
    TaskCheckHold pointEvidenceRecordNext action

    Simple explanation

    Identify unclear or conflicting details and raise RFIs before procurement or site work relies on an assumption.

    Technical context

    Coordinate this work against Consented architectural, structural, civil, drainage, H1, and specialist documents, Product schedules, the current consent status, and the actual site condition. Confirm interfaces before releasing dependent work.

    Why it matters: The main recorded risk is: Required evidence discovered too late. A missed check can create rework, delay, hidden defects, an inspection failure, or a departure from approved project documents.

    Prerequisites

    • Consented architectural, structural, civil, drainage, H1, and specialist documents is current, approved for the intended use, and available to the people doing the work.
    • Product schedules and relevant product information have been checked.
    • Access, responsibility, safety controls, preceding work and the pre-construction consent review sequence are confirmed.

    Checks

    • Check the completed work against Consented architectural, structural, civil, drainage, H1, and specialist documents and Product schedules.
    • Check specifically for: Required evidence discovered too late.
    • Avoid this known mistake: Allowing the next activity to hide incomplete checks or missing evidence.

    Evidence to save

    • Wide, location-identifying and close-up photographs of the completed building consent documents review work before it is concealed.
    • Marked-up Consented architectural, structural, civil, drainage, H1, and specialist documents or a precise drawing/detail reference.
    • Pre-construction consent review result, consultant record, trade QA record or written not-applicable reason.

    Hold point

    Do not cover, backfill, load, connect, certify or release the next activity until Pre-construction consent review and the required project evidence are complete or the authorised reviewer confirms what may proceed.

    Stop or escalate when

    • Required evidence discovered too late
    • Allowing the next activity to hide incomplete checks or missing evidence
    • The current drawing, approval, competent reviewer or required evidence cannot be confirmed.

    Documents and records

    • Consented architectural, structural, civil, drainage, H1, and specialist documents
    • Product schedules
    • Current RFI/site-instruction/change record
    • Inspection and evidence register
    Cost effect
    Rectification, reinspection, delay, damaged follow-on work, access loss and changed scope can increase the cost of building consent documents review. Record the cause and obtain written pricing before approving a commercial change.
    Programme effect
    This activity controls the release of dependent work. Update the lookahead programme and notify affected trades if the hold point, information, inspection or evidence is not ready.

    Next action

    Close the building consent documents review stage, link its evidence, resolve outstanding defects and release only the next applicable stage.

    Applicability: Apply when this work package is included in the current project scope. Confirm project-specific consent, contract, design, site and authority requirements.

    Use the current consented/issued project documents and competent site review. BuildPath does not approve work.

Trade-to-trade control

Interfaces and release gates

Use the actual consented design, specification and authorised reviewers. These controls help expose gaps; they do not approve work.

Release this stage to the next team

Prerequisites

  • Current consented/contract documents and scope are available
  • Preceding work, access, safety and materials are ready
  • Named people own open RFIs, defects, inspections and evidence

Interface checks

  • Work matches the current documents and actual site condition
  • Interfaces with the preceding and following trades have been walked
  • Cost, programme, change and evidence consequences are recorded
Hold point: Do not cover, load, connect, backfill or release dependent work until the required reviewer accepts the stage or records an authorised exception.

Evidence before release

  • Location and detail photographs
  • Dated checklist/inspection/RFI references
  • Daily report and linked action/defect records

Next team: The next applicable project team

Open the related Workspace control →

What happens in this stage

  • Confirm the consent number, scope, issued date, approved document list, stamped revisions, specified inspections, and supporting reports.
  • Build an inspection and CCC evidence matrix covering producer statements, Records of Work, certificates, as-builts, warranties, and product evidence.
  • Identify unclear or conflicting details and raise RFIs before procurement or site work relies on an assumption.

Before work starts

  • Confirm the latest issued-for-construction and consented documents for building consent documents review are on site, including Consented architectural, structural, civil, drainage, H1, and specialist documents.
  • Check Stamped specification, approved product data, RFIs, minor variations, and amendment status before work starts.
  • Confirm the subcontractor understands the scope, hold points, access, protection requirements, H&S controls, and quality evidence required.
  • Check the programme sequence so this stage does not start before earlier work, inspections, testing, or concealed-work photos are complete.
  • Confirm materials delivered to site match the specification, are dry/undamaged, and are stored according to manufacturer instructions.

During the work

  • Walk the work face early, mid-shift, and before close-up. Compare actual work with the consented drawings, specification, and manufacturer details.
  • Check set-out, levels, falls, clearances, penetrations, fixings, bracing, waterproofing, or protection points that will be difficult to see later.
  • Ask trades to show their own quality checks rather than only saying the work is complete.
  • Keep weather, site condition, delivery, delay, inspection, RFI, variation, and safety notes in the daily report.
  • Photograph any work before it is covered, backfilled, lined, clad, tiled, painted, or otherwise hidden.

After the work

  • Complete a close-out walk with the subcontractor and mark defects immediately while access is still available.
  • Confirm required inspection bookings, council results, producer statements, LBP Records of Work, warranties, test certificates, or installer declarations are obtained.
  • Update as-built notes where service routes, drainage, fixings, penetrations, or dimensions differ from the design.
  • Confirm the area is protected from weather, other trades, impact damage, contamination, or premature loading.
  • Update the lookahead programme and tell affected trades what is ready, what is blocked, and what must not be covered.

Common problems and step-by-step solutions

Building consent documents review information is incomplete or conflicting
  1. 1Stop the affected building consent documents review activity if continuing could hide defective work, create unsafe work, or move away from the consented design.
  2. 2Photograph the condition from wide, medium, and close-up angles. Include a tape, level, datum mark, gridline, or drawing reference where useful.
  3. 3Check the latest consented architectural, structural, civil, services, and specification documents before giving an instruction.
  4. 4Ask the subcontractor to explain the cause, proposed fix, timing impact, and whether the fix changes consented work.
  5. 5Escalate to the builder/project manager, designer, engineer, council inspector, or client when the fix affects structure, weathertightness, drainage, H1, fire/safety, cost, programme, or consent.
  6. 6Record the decision, responsible person, drawing/RFI/variation reference, photos, and follow-up inspection in the daily report.
Building consent documents review is not ready when the programme requires it
  1. 1Stop the affected building consent documents review activity if continuing could hide defective work, create unsafe work, or move away from the consented design.
  2. 2Photograph the condition from wide, medium, and close-up angles. Include a tape, level, datum mark, gridline, or drawing reference where useful.
  3. 3Check the latest consented architectural, structural, civil, services, and specification documents before giving an instruction.
  4. 4Ask the subcontractor to explain the cause, proposed fix, timing impact, and whether the fix changes consented work.
  5. 5Escalate to the builder/project manager, designer, engineer, council inspector, or client when the fix affects structure, weathertightness, drainage, H1, fire/safety, cost, programme, or consent.
  6. 6Record the decision, responsible person, drawing/RFI/variation reference, photos, and follow-up inspection in the daily report.
Building consent documents review evidence or approval cannot be located
  1. 1Stop the affected building consent documents review activity if continuing could hide defective work, create unsafe work, or move away from the consented design.
  2. 2Photograph the condition from wide, medium, and close-up angles. Include a tape, level, datum mark, gridline, or drawing reference where useful.
  3. 3Check the latest consented architectural, structural, civil, services, and specification documents before giving an instruction.
  4. 4Ask the subcontractor to explain the cause, proposed fix, timing impact, and whether the fix changes consented work.
  5. 5Escalate to the builder/project manager, designer, engineer, council inspector, or client when the fix affects structure, weathertightness, drainage, H1, fire/safety, cost, programme, or consent.
  6. 6Record the decision, responsible person, drawing/RFI/variation reference, photos, and follow-up inspection in the daily report.

Verification

Source / where to check

Use current official information and the controlled documents for the actual project.

MBIE guidance explains that work should be built to the issued building consent, inspections must be managed, and records/certificates should be kept for CCC.

Use when a site change may require a minor variation or amendment before work continues.

Auckland Council explains local building consent processes, CCC, related certificates, producer statements, LBP notification, and whether resource consent may also be needed.

Consented drawings and specifications

The issued consent drawings, stamped specifications, engineering drawings, RFIs, minor variations, and amendments control the specific project.

Manufacturer specification

Use the exact current installation manual, warranty requirements, BRANZ/Appraisal information where applicable, and product data sheet for the product on site.

Insufficient data to verify

Insufficient data to verify — confirm against the current consented drawings, specifications, Auckland Council requirements, Auckland Unitary Plan, NZ Building Code, relevant NZ Standard, consultant advice, manufacturer instructions, insurance broker, insurer, lender, lawyer, accountant or project contract.

Project-specific consented documents and professional advice override generic guidance.

Common inspections required

  • Pre-construction consent review
  • BCA inspection sequence review

Common risks

  • Work built from tender drawings
  • Consent scope misunderstood
  • Required evidence discovered too late

Common mistakes

  • Starting building consent documents review without confirming the current documents and responsibility
  • Relying on a verbal answer without recording the source, decision, owner, and due date
  • Allowing the next activity to hide incomplete checks or missing evidence

Required documentation

  • Latest consented drawings and specifications
  • Relevant RFIs, site instructions, amendments, minor variations, and variation approvals
  • Subcontractor scope, QA checklist, delivery dockets, product data, and installation records
  • Inspection booking/result records and photos before cover-up
  • Daily site report notes covering labour, weather, progress, delays, risks, and decisions

Photos or diagrams needed

  • Wide photo showing where building consent documents review is happening on the site
  • Close-up photos of critical details, fixings, laps, seals, penetrations, clearances, levels, or falls
  • Photo of product labels, batch numbers, delivery dockets, and installer marks where relevant
  • Marked-up drawing or simple diagram showing any changed location, clash, defect, or agreed remedial detail

Construction manager checklist

  1. 1Scope, drawings, specification, product data, and latest revision confirmed
  2. 2Trade briefed on hold points, tolerances to verify, evidence required, and inspection sequence
  3. 3Access, storage, protection, temporary works, and safety controls in place
  4. 4Work checked against drawings during installation, not only at completion
  5. 5Photos and records captured before work is concealed
  6. 6Defects, RFIs, delays, and variations recorded with owner and due date
  7. 7Inspection/producer statement/warranty/Record of Work requirements tracked for CCC

Questions to ask the subcontractor

  • Which drawing, detail, or manufacturer instruction are you working from?
  • What needs to be checked before this is covered or handed to the next trade?
  • What could stop you today: weather, access, materials, information, inspections, or other trades?
  • Does anything on site differ from the drawings or specification?
  • What evidence will you provide for the quality file and CCC file?

Red flags to stop work

  • Work differs from consented drawings or specification and no approved variation/RFI exists
  • A structural, weathertightness, waterproofing, drainage, fire/safety, or H1 detail is unclear
  • The trade wants to cover work before inspection, testing, or photos are complete
  • Specified materials are missing, substituted, damaged, wet, expired, or installed outside manufacturer instructions
  • A safety control is missing for excavation, heights, plant movement, electrical work, asbestos, silica, or public protection

What to record in the daily report

  • Exact location and quantity of work completed
  • Trade headcount, company names, plant used, deliveries, and material batch/product details
  • Weather, site conditions, delays, instructions received, RFIs raised, and inspections booked/passed/failed
  • Photos taken before cover-up and any defects or non-conformances found
  • Next-day lookahead, blockers, and who is responsible for each action

Use this in my project

Turn building consent documents review into controlled action

Open the relevant workspace register, create the project-specific record, link the controlling documents and preserve evidence. The guide does not automatically approve or verify the action.

Open workspace